Skip to page content
SHORE

Residential design and construction / Balgowlah

Builders in Balgowlah for one home or a pair

One family home or two residences with their own sense of privacy. We design and build in Balgowlah, where our FERN dual occupancy is under construction.

FERN / Balgowlah / Under construction

01 / The proposition

Room for two households, each with its own life

As builders in Balgowlah, we often start with a simple question about the land. Can it hold two homes, each with a comfortable entry, a useful garden and private living space, without one feeling like the leftover half?

FERN is our local answer to that question: two residences in Balgowlah, with architecture by Doroch Architects and SHORE's interiors and facade. The design brings curved rendered forms, natural stone and planting together. It is under construction now.

The suburb itself is mixed. In the 2021 Census, apartments made up 40.3% of Balgowlah's occupied private dwellings and separate houses 34.6%. We look at your existing house and the homes around it before we recommend a renovation, knockdown rebuild or dual occupancy study.

Ahead of a duplex decision

Confirm what the land allows, then draw

Balgowlah is a nominated town centre under the NSW housing reforms, which can open up new options for eligible land nearby. Whether those options reach your property depends on the walking catchment, its zoning and any exclusions. We settle that first, before two homes become the brief or a single house is priced for demolition.

Shore Projects Architectural Cartography

Loading Architectural Map...
SHORE PROJECTS · LOCATIONS ARE APPROXIMATE

Select a pin or drag to explore

Map data: Esri, HERE, Garmin · © OpenStreetMap contributors

FERN project in Balgowlah
Loading photo…
Under construction

Balgowlah · residential

[ FERN ]

Positioned on Neild Avenue in Balgowlah, FERN is a pair of residences shaped around the trees that surround them. Curved white render forms sit above a natural stone base, with timber battens and cascading greenery softening every level.

Map locationBalgowlah · Indicative location
Doroch Architects
Explore project details

Reading a Balgowlah block

The street, the trees and the approval route

Balgowlah residential map examples include R1 land capped at 8.5 metres in height with a 0.5:1 floor space ratio. The same examples show a 300 square metre minimum lot map value. These figures vary by street and are not an entitlement to subdivide, build a duplex or use the same limits under every approval pathway.

  1. 01

    Check the centre catchment.

    Council names Balgowlah in its low and mid rise housing guidance. The test turns on walking distance and eligible land, so a suburb name is not enough to settle it.

  2. 02

    Treat trees as part of the site.

    The heritage map lists protected street trees as well as buildings such as Edinboro and Whitehall. We check the mapped item and its setting before planning demolition, a driveway crossing or digging near roots.

  3. 03

    Consent is not complying development.

    A dual occupancy permitted with consent does not automatically qualify for a CDC. The certifier decides the applicable code, whether the land is eligible and whether every required standard is met.

  4. 04

    Price the ground work on real information.

    A basement or substantial retaining calls for ground and structural advice. Spoil removal, protecting neighbouring buildings and machinery access can all change the construction scope.

Developing a pair of homes

How we shape two homes that share a site

A second dwelling changes far more than how many bedrooms you get. We settle how the two homes relate while the plan is still easy to move.

  1. Give each household a brief.

    Start with who will live in each residence and how that could change over time. We test entrances, living spaces and gardens against those needs.

  2. Plan access with the landscape.

    Cars, front doors and significant trees go on one plan. The obvious garage position sometimes has to shift once all three are drawn together.

  3. Resolve the shared junctions.

    We review the separation between the residences with the structure, services and drainage. That sets the construction scope and shows which consultant advice is still missing.

  4. Build what was agreed.

    Approval and building documentation are complete before anyone starts on site. Construction follows the coordinated details for each residence and the parts they share.

Your property, your starting point

A new pair or a better version of the home you have

We can design the architecture and interiors with construction in mind from the first sketch. Where an independent architect is already on board, we join the project to review their design and build it.

A dual occupancy feasibility study.

We start with the title, the survey and how each residence will be used. The planning questions are answered before the design commits to two homes.

Rework or rebuild one home.

Tell us what you love about the house and what no longer works. We weigh the structural work of keeping it against what a replacement would need.

Explore our work

FERN, a Balgowlah dual occupancy taking shape

hero-fern

[ FERN ]

Balgowlah, NSW

Under construction

Two residences bring curved render, stone and planting into a single composition. Architecture is by Doroch Architects with interiors and facade by SHORE.

Architecture
Doroch Architects
Interiors & facade
SHORE

Between the centre and the harbour

Every Balgowlah street asks something different

A lot near the town centre and a house closer to North Harbour can raise different planning questions. We define the work from your actual lot and its surroundings, including neighbouring windows, protected trees and the access available. FERN is one local project with its own design and approvals.

Questions to bring early

Building in Balgowlah: common questions

Does FERN mean my Balgowlah property can have a duplex too?

No. FERN is one particular dual occupancy, still being built, with its own site and approvals. Your lot is assessed separately for zoning, dimensions, constraints and the proposed building form.

Is every Balgowlah house inside the town centre housing reforms?

No. Council guidance uses a walking distance test around the nominated centre. The land must also meet the policy requirements and avoid its exclusions. We check your property before relying on those provisions to shape a scheme.

Can protected street trees affect a new driveway in Balgowlah?

Yes. A tree or landscape heritage item can affect where access and excavation can go. The heritage list includes street trees in Balgowlah. We draw the trees and the proposed crossing together so the right advice comes in before the garage position is fixed.

Should I renovate my Balgowlah house or knock down and rebuild?

Compare both against what the existing structure can support and any heritage constraints. A renovation can keep the rooms and character you value, while a replacement carries a different demolition and approval scope. We talk through those differences before drawing anything.

One home or a pair

Share your plans for your Balgowlah land

Send the property details and your plans for the site. We will explain what to test before you choose between improving the house, a new home or two residences.

Start your Balgowlah project
AboutProjects