Skip to page content
SHORE

Kirribilli / Residential construction

Builders in Kirribilli, from terraces to harbour homes

BEAUCHAMP, a collection of nine residences now under construction, is part of our Kirribilli work. For your own home, our architects and builders work as one around the existing fabric, the harbour setting and the scope you are weighing up.

BEAUCHAMP / Kirribilli / Under construction

01 / The proposition

Your home on the Kirribilli peninsula

As builders in Kirribilli, we start with the property you own. A terrace near Jeffreys Street, an apartment and a house above Careening Cove each bring different questions about retained structure, access and approvals. We sort that out first, then shape the brief, whether that means renovating, building new or developing.

BEAUCHAMP is our clearest reference here. Its nine residences sit above the marina, with cars parked on two basement levels. BHMP is the architect and Henderson & co designed the interiors and facade. The project is under construction.

What stays and what changes

Keep, extend or rebuild in Kirribilli

Kirribilli, Careening Cove and Jeffreys Street each have their own conservation area. For a house inside one of them, a knockdown rebuild starts with an assessment of its heritage significance. We can design a brief that keeps the original footprint and adds the rooms you need. We can also review a new house proposal once its planning basis is clear.

Shore Projects Architectural Cartography

Loading Architectural Map...
SHORE PROJECTS · LOCATIONS ARE APPROXIMATE

Select a pin or drag to explore

Map data: Esri, HERE, Garmin · © OpenStreetMap contributors

BEAUCHAMP project in Kirribilli
Loading photo…
Under construction

Kirribilli · residential

[ BEAUCHAMP ]

SHORE is proud to announce the commencement of our latest boutique luxury apartment development in Kirribilli.

Map locationKirribilli · Indicative location
BHMP
Explore project details

Before choosing a building form

Heritage, the station and site access

Council's current DCP has a dedicated Kirribilli planning area. State housing policies can also apply, so your planning advice should spell out what covers your land.

  1. 01

    Conservation status comes first.

    We check for an individual listing and the part the building plays in the mapped conservation area. Council's heritage controls favour keeping buildings and ask for a reasoned assessment of any demolition.

  2. 02

    The station is a separate test.

    Council names Milsons Point station in its housing reform guidance. Walking distance and zoning are weighed alongside heritage status. The station does not remove those obligations.

  3. 03

    A house and a duplex follow different rules.

    Each is assessed against its own standards. Foreshore controls or heritage protections can rule out the Housing Code, so we confirm the approval route before counting on a CDC.

  4. 04

    A basement needs a workable access plan.

    Careening Cove has sandstone retaining walls and irregular lots. Before a basement becomes a fixed part of the brief, we want to know how the excavation, neighbouring structures and delivery route will be investigated.

From existing fabric to new rooms

How we plan a Kirribilli build

Our first drawings go beyond the floor plan. They show what holds the house up, which parts must be kept and how the work will reach the site.

  1. We record what is there.

    Original masonry, roof forms and any earlier additions go on the drawings. The heritage assessment joins the conversation before anything leaves the brief.

  2. We draw through the slope.

    Sections run from the street through each floor to the rear garden, with the buildings next door shown. That way we look at excavation and level changes together.

  3. We plan the way in.

    We test street or lane access for deliveries and for taking excavated material away. The sequence around the retained structure is agreed before we price the build.

Choose the starting point

Start with our architects or bring your own design

You can come to us while the ideas are still open. Owners with an architect and a design already in hand can bring us in as the construction team.

Rooms that no longer work.

Our design team links the rooms you have with the space you need. The heritage response and the build itself are part of the thinking from the first sketch.

A finished architectural scheme.

Bring the approval documents and details your consultants have prepared. We set our building role around that scheme and flag any open structural or access questions.

Explore our work

BEAUCHAMP takes shape in Kirribilli

[ BEAUCHAMP ]

[ BEAUCHAMP ]

Kirribilli, NSW

Under construction

Nine residences above Kirribilli Marina, with cars parked over a two level basement. See the design and the project team while construction continues.

Architecture
BHMP
Interiors & facade
Henderson & co

The peninsula and its coves

Every Kirribilli street sits differently

The Carabella Street ridge and the lower streets around Careening Cove meet the harbour in different ways. A lane that looks clear on a plan still needs a look on the ground. We walk your access and levels before we talk about how the build could run.

Questions to bring early

Building in Kirribilli: common questions

Is BEAUCHAMP finished?

Not yet. BEAUCHAMP is under construction. BHMP designed it as nine residences above a two level basement car park. Henderson & co designed its interiors and facade.

Can I build a duplex in Kirribilli because I am near Milsons Point station?

Not on that basis alone. The housing reforms set zone and location tests. Heritage items are treated differently from conservation areas. A proposal for two dwellings is assessed against its own standards and on whether that land qualifies.

What matters before I change a Jeffreys Street frontage?

The property's heritage status and the parts that contribute to the streetscape. Roof forms and original masonry can matter. So can the way the house sits beside its neighbours.

Why look at a Careening Cove lane before drawing a basement?

A lane can give you access and still limit the machinery and delivery sequence. We check its width, level changes and the existing walls beside it against the works you want. What we find can change the build cost and the basement layout.

Your property and its possibilities

Let's plan the next chapter of your Kirribilli home

Share your current floor plan with a note on what you would add or improve. We will point out which parts of the brief need heritage, design or construction input first.

Start your Kirribilli conversation
AboutProjects