Building FAQ

These are the questions Sydney homeowners ask us most often before and during a build, from council approvals and duplexes to knockdown rebuilds, renovations, building contracts and where the budget goes.

Each answer is checked against current NSW rules and published sources, then dated so you can see when it was last reviewed.

Custom homes

When does a new home need a BASIX certificate?

Every new home in NSW needs a BASIX certificate lodged with its DA or CDC, setting the water, energy and thermal commitments the house must meet before occupation.

Fixed price or cost plus: which building contract suits a custom home?

A fixed price contract sets the sum before building starts, while cost plus passes on actual costs plus a margin, so the right choice depends on how complete the design is.

Is home warranty insurance compulsory in NSW?

Home warranty insurance, now Home Building Compensation cover, is compulsory for most NSW building work over $20,000 and pays out when the builder cannot finish or fix it.

Do I need an independent building inspector if I have a certifier?

NSW law does not require an independent building inspector for a new house, although one can check the work against your contract before each payment.

What is an occupation certificate in NSW?

An occupation certificate lets you move into a new home in NSW. Your principal certifier issues it once the house matches its approval and is suitable to live in.

All 15 custom homes questions

Design and build

What should a client and architect agreement include?

NSW requires a written client architect agreement, usually before work starts, setting out the services, the fee method, how changes are approved and how the agreement ends.

What is a construction certificate in NSW?

On the DA path in NSW, a construction certificate is the building approval that follows consent, issued once the detailed plans meet the consent and the Building Code.

How do construction drawings differ from DA drawings?

DA drawings show council the form, siting and impact of a new home. Construction drawings add the detail a certifier checks and a builder works from.

Which site survey do I need before designing a house?

A detail and level survey records the levels, structures, trees and services a design starts from, while a boundary survey fixes where the title boundaries sit.

What are the stages of designing a house?

Designing a house moves from the brief and site through concept design and design development to approval, then the detailed construction documents.

All 16 design and build questions

Duplexes and dual occupancy

Can a dual occupancy be sold separately in NSW?

A dual occupancy can be sold as two homes once it is subdivided into Torrens or strata lots, which is why the title is best planned with the design.

Can you hear your neighbours through a duplex party wall?

The code sets a minimum sound rating for a duplex party wall, so what you hear next door comes down to the wall system, the layout and how the details are built.

Does a duplex need a Section 73 certificate from Sydney Water?

Sydney Water lists dual occupancy among developments councils refer for a Section 73 certificate, which confirms water and wastewater servicing before occupation.

Duplex or townhouse: which is better?

A duplex fits a single Sydney block and keeps each home on the street, while townhouses suit larger development sites built around a shared driveway.

How long does it take to build a duplex?

A typical duplex takes SHORE about 12 months to build once approved, a basement adds three to four months and design, approval and servicing sit either side.

What fire separation is required between the homes in a duplex?

The two homes in an attached duplex are divided by a fire separating wall from footings to roof, with its penetrations and roof junctions protected under the code.

What is dual occupancy?

Dual occupancy is the NSW planning term for two homes on one lot, attached or detached, which most people simply call a duplex.

Knockdown rebuild

Can I build over a sewer line when replacing my house?

Sydney Water considers some structures over sewers 300 mm or smaller, refuses others and must approve the building plans first, often with encasement or piers as conditions.

Do you need council approval to demolish a house in NSW?

Demolishing a house in NSW needs a complying development certificate or a development application to council, with heritage listings usually deciding which one applies.

How much does it cost to demolish a house in Sydney?

Sydney demolition guides put a house at $15,000 to $55,000 in 2026, with asbestos removal, slab removal and tight access usually priced on top.

What is a dilapidation report and do I need one before demolition?

A dilapidation report is a dated photo record of neighbouring buildings before demolition, needed when your approval asks for one and useful near a boundary.

Renovations

Do I need a structural engineer before removing an internal wall?

A structural engineer should assess any internal wall that might carry load before it comes out, since removal is structural work with design and approval steps.

Do I need an asbestos inspection before renovating or demolishing?

In NSW asbestos the work may disturb must be found before renovation or demolition, so a pre 1990 home needs a survey before the scope and price are fixed.

Do I need to tell my home insurer before renovating?

Tell your home insurer in writing before a renovation starts, because your policy decides cover during the work while the builder's insurance covers the work itself.

What can I build without council approval in NSW?

Decks, sheds, fences and like for like kitchens can be exempt development in NSW when they meet every State standard, although heritage and zoning can change the answer.

What is a waterproofing certificate and when is it needed for a renovation?

A waterproofing certificate is the waterproofer's written record of the work, separate from their licence and from any certifier's inspection before tiling.